Shipping today
Home/Parts/Adhesion preparation
ADHESION PREPARATION

Adhesion preparation
by drawing

We prepare the surface of a cylinder or tube for bonding and potting: remove the gloss, set the roughness, ensure adhesion to the compound.

0.010mm
Tolerance
24h
Quote by drawing
from 3days
Lead time
Method
Mechanical surface preparation
Tolerance
0.010mm
Lead time
from 3days
Batch
from 1pcs
KEY POINTS

Machining considerations

  • 01Roughness matched to the specific adhesive or compound on request
  • 02Outer and inner surface, in sections or along the whole length
  • 03Needed where the part is potted or bonded into metal hardware
  • 04Combined with facing and hole machining in one operation
PARAMETERS

Technical parameters

ParameterValue
MethodMechanical surface preparation
ToleranceUp to 0.01 mm on selected dimensions after drawing review
Minimum batchFrom 1 piece
INQUIRY

Need a size
not in the catalog?

Send us a drawing — we'll respond with a quote in 24 hours. We work with batches from 1 piece.